Fire Department Connections New York: UL 405 Listed and FM 1510 Approved 2-Way, 3-Way and Storz FDCs for NYC Building Code Chapter 9, NFPA 14 Section 8.17 and FDNY RCNY 3 RCNY 101-06 Standpipe, Sprinkler and Fire Pump Test Header Installations
ValveAtlas supplies UL 405 Listed (Fire Department Connections for Fire-Protection Service) and FM Class 1510 Approved fire department connections (FDC, siamese, inlet connections) including 2-way and 3-way wall/exposed configurations, Storz 4 inch and 5 inch quick-connect, freestanding pedestal, flush sidewalk, roof manifold and fire pump test header FDCs to fire protection contractors, mechanical subs, high-rise developers and industrial facility owners across Manhattan, Brooklyn, Queens, Bronx, Staten Island, Jersey City, Newark, Hoboken, Yonkers and White Plains. Metro delivery, cast brass or rough chrome body, integral check and clapper valves for backflow prevention, break-off cap chains and FDNY submittal packages for New York fire department connections.
This page is the technical reference for New York specifying engineers, fire protection engineers, mechanical consultants and municipal water utilities selecting FDC packages for JFK (JFK), LaGuardia (LGA), Newark Liberty (EWR) and Teterboro (TEB) airside, IBM Yorktown, Regeneron Tarrytown, Pfizer Pearl River, Bristol-Myers Squibb New Brunswick and Tesla Gigafactory Buffalo industrial sites, One World Trade, Empire State, Hudson Yards, Midtown Manhattan commercial towers, Long Island City and Downtown Brooklyn high-rise towers, Columbia, NYU, Cornell Tech, Fordham, CCNY, Brooklyn Poly NYU, Stony Brook and Rutgers campus and Equinix NY1-NY11, Digital Realty 111 8th Avenue, 60 Hudson, 325 Hudson, 32 Avenue of the Americas and Telx/Digital Realty Weehawken data center installations, governed by NYC Building Code Chapter 9 and NFPA 14 Section 8.17, NFPA 13 Section 8.17 and FDNY Rule 3 RCNY 101-06.
FDC range for New York fire protection projects
| Type | UNIVAL SKU | Inlet configuration | Outlet size | Listings | Typical New York application |
|---|---|---|---|---|---|
| 2-way wall FDC | UVFDC-2W-2.5 | 2 x 2.5 inch NH female swivel | 4 inch NPT outlet | UL 405, FM 1510 | Standard commercial standpipe/sprinkler inlet on exterior wall |
| 3-way wall FDC high-rise | UVFDC-3W-2.5 | 3 x 2.5 inch NH female swivel | 6 inch NPT outlet | UL 405, FM 1510 | High-rise combined standpipe/sprinkler for Class I/III system |
| Storz 4 inch wall FDC | UVFDC-STZ4-W | Storz 4 inch quick-connect | 4 inch NPT outlet | UL 405, FM 1510 | Quick-connect FDC for high-volume fire department supply |
| Storz 5 inch wall FDC | UVFDC-STZ5-W | Storz 5 inch quick-connect | 5 inch NPT outlet | UL 405, FM 1510 | Large-diameter Storz for high-volume pumper supply |
| Freestanding 2-way FDC | UVFDC-2W-FS | 2 x 2.5 inch NH with pedestal post | 4 inch NPT outlet | UL 405, FM 1510 | Freestanding FDC where wall mount impossible, with pedestal support |
| Freestanding Storz FDC | UVFDC-STZ-FS | Storz 4 inch or 5 inch with pedestal post | 4 inch or 5 inch NPT outlet | UL 405, FM 1510 | Freestanding Storz FDC with pedestal, rapid deployment |
| Sidewalk flush FDC | UVFDC-SIDE-2W | 2 x 2.5 inch NH flush-mount with hinged cover | 4 inch NPT outlet | UL 405, FM 1510 | Flush sidewalk FDC for narrow frontage, hinged plate per NYC FDNY spec |
| Sidewalk Storz flush | UVFDC-SIDE-STZ | Storz 4 inch flush-mount with hinged cover | 4 inch NPT outlet | UL 405, FM 1510 | Flush sidewalk FDC with Storz for high-rise narrow frontage |
| Fire pump test header | UVFDC-TEST-4 | 4 x 2.5 inch NH discharge test outlets | 6 inch NPT inlet from pump | UL 405, FM 1510 | Fire pump test header for NFPA 25 Chapter 8 pump flow test |
| Roof manifold FDC | UVFDC-ROOF-2W | 2 x 2.5 inch NH on roof manifold | 4 inch NPT outlet | UL 405, FM 1510 | Roof-level FDC manifold for high-rise auxiliary supply |
Why New York contractors choose ValveAtlas fire department connections
UL 405 and FM 1510 dual listing for FDNY acceptance. Every UNIVAL FDC is UL 405 Listed (Fire Department Connections for Fire-Protection Service) and FM Class 1510 Approved. FDNY accepts listed FDCs with factory submittal, NYC BC Chapter 9 compliance letter and NFPA 14 Section 8.17 documentation. UL 405 certifies the FDC body, internal clapper check valves, swivel inlets, plug/cap and drain provisions.
Integral clapper check for backflow prevention. UVFDC-2W and UVFDC-3W include internal spring-loaded clapper check valves on each inlet that prevent backflow from the standpipe or sprinkler system through an unused inlet. NFPA 14 Section 8.17 requires each FDC inlet to have a clapper check. UNIVAL clapper is bronze with stainless spring, rated 300 psi working, 600 psi hydrostatic.
Brass or rough chrome finish with break-off cap chains. UVFDC bodies are cast red brass (ASTM B584) standard, rough chrome or polished chrome on request. Each inlet comes with a bronze plug or cap on a chain (break-away chain on sidewalk FDCs) to prevent debris ingress. Identification plate cast into body with “FIRE DEPARTMENT CONNECTION – STANDPIPE”, “AUTO SPKR” or “AUTO SPKR AND STANDPIPE” per NFPA 14/13 Section 8.17.1.
Swivel inlets with FDNY-compatible thread. UVFDC-2W and UVFDC-3W inlets are female swivel with 2.5 inch NH with FDNY-specific thread (NYC thread) for standard 2-way and 3-way inlets. Storz 4 inch (FDNY standard pumper inlet) and Storz 5 inch quick-connect inlets for FDNY apparatus. Thread form is specified per factory order to match local fire department apparatus hose couplings. Swivel allows 360-degree rotation for fire department hose engagement at any angle.
Check valve integral with FDC body. NFPA 14 Section 8.17 and NFPA 13 Section 8.17 require a listed check valve between the FDC and the standpipe or sprinkler system. UVFDC bodies include integral main clapper check downstream of the inlet clappers to prevent system water egress through the FDC during testing or inspection. Combined UL 405 listing covers both inlet clappers and main check.
Direct substitution for Potter Roemer, Croker, Guardian, Elkhart and Zurn. UNIVAL UVFDC series is UL 405/FM 1510 listed equivalent to Potter Roemer Fig 5062, Croker 6700, Guardian GA4000, Elkhart S-300, Zurn Wilkins 375 and Dixon DIX. FDNY accepts listed equivalent substitutions with engineer-of-record approval and factory submittal package including internal clapper check drawing, UL certificate and pressure rating verification.
Code and listing acceptance for New York
NYC Building Code Chapter 9. NYC Building Code Chapter 9 references NFPA 14 Section 8.17 (standpipe FDC) and NFPA 13 Section 8.17 (sprinkler FDC) for combined-system FDC placement. FDC shall be located not less than 18 inches and not more than 48 inches above grade per NFPA 14 Section 8.17.3 and shall be visible and accessible to the fire department within 100 ft of a fire lane or paved access per NFPA 14 Section 8.17.4.
NFPA 14 Section 8.17 standpipe FDC. NFPA 14 Section 8.17 requires one 2.5 inch inlet for every 250 gpm of standpipe flow, minimum 2 inlets for Class I and III standpipes, with integral listed check valve between FDC and standpipe riser. Storz connection permitted with FDNY approval. UVFDC-2W meets minimum requirement; UVFDC-3W provides additional capacity for high-rise Class I/III systems.
NFPA 13 Section 8.17 sprinkler FDC. NFPA 13 Section 8.17 requires an FDC for sprinkler systems with a water demand of 250 gpm or greater, with minimum 2-way 2.5 inch NH inlets and integral check valve between FDC and sprinkler riser. UVFDC-2W and UVFDC-SIDE-2W satisfy NFPA 13 requirement for exterior-accessible FDC upstream of sprinkler riser check valve.
UL 405 Fire Department Connections. UL 405 governs FDC body, clapper check valves, swivel inlets, plugs/caps and drain construction. UVFDC series meets UL 405 with bronze body, spring-loaded bronze clapper, NH or Storz inlet with thread gauge certification and break-chain cap. UL 405 required for all NFPA 13/14 applications.
FM 1510 approval. FM 1510 governs fire service valves and associated equipment including FDCs. UNIVAL UVFDC series carries FM Class 1510 approval for standpipe, sprinkler and combination systems per FM Data Sheet 4-0 guidance on water supply.
FDNY acceptance. FDNY Bureau of Fire Prevention, NYC DOB and NYC DEP inspection references NYC Building Code Chapter 9, NFPA 14 Section 8.17, NFPA 13 Section 8.17 and FDNY Rule 3 RCNY 101-06 and manufacturer listing. Factory submittal with UL 405/FM 1510 certificates, NFPA 14/13 Section 8.17 compliance letter and hydrostatic pressure test report required for sign-off. FDC sign identification per NFPA 14 Section 8.17.1 required at the installation.
Potter Roemer, Croker, Guardian, Elkhart and Zurn substitution for New York projects
Potter Roemer Fig 5062 2-way wall FDC. Substitute UVFDC-2W-2.5 at matching 2 x 2.5 inch NH inlets, 4 inch NPT outlet and integral clapper check configuration. Same UL 405/FM 1510 listing, cast red brass body, bronze clapper and break-chain plugs. New York standard combined standpipe/sprinkler FDC substitution with factory submittal package.
Croker 6700 2-way wall FDC. Substitute UVFDC-2W-2.5 at matching inlet configuration, outlet size and check valve position. Same UL 405 listing and FDNY/FDNY pentagon-head operating plug thread form. Substitution requires engineer-of-record approval and factory submittal drawing.
Guardian GA4000 Storz wall FDC. Substitute UVFDC-STZ4-W or UVFDC-STZ5-W at matching Storz 4 inch or 5 inch size and outlet NPT diameter. Same UL 405 listing with integral check. Storz thread compatibility with FDNY apparatus verified per factory order.
Elkhart S-300 freestanding FDC. Substitute UVFDC-2W-FS or UVFDC-STZ-FS at matching inlet count, thread form and pedestal post height. Same UL 405/FM 1510 listing with pedestal support. Replace Elkhart with UNIVAL on sidewalk-impossible installations where freestanding pedestal FDC is specified.
Zurn Wilkins 375 and Dixon DIX FDCs. Substitute UVFDC-2W-2.5, UVFDC-3W-2.5 or UVFDC-SIDE-2W at matching configuration. Same UL 405 listing with integral clapper check valves. Sidewalk flush version UVFDC-SIDE-2W with hinged cover plate and counter-balanced flap for narrow frontage.
NEWCO NC-FDC combined FDC. Substitute UVFDC-2W-2.5 or UVFDC-3W-2.5 at matching configuration. Same UL 405/FM 1510 listing, cast brass body and integral clapper check. Combined standpipe/sprinkler label per NFPA 14 Section 8.17.1.
Installation scenarios for New York FDCs
JFK (JFK), LaGuardia (LGA), Newark Liberty (EWR) and Teterboro (TEB) airside and terminal fire protection. Airport terminal and airside fire protection with UVFDC-2W-2.5 at terminal building ingress, UVFDC-STZ4-W Storz 4 inch at fire lane approach for FDNY pumper supply and UVFDC-TEST-4 fire pump test headers on airside fire pump house. NFPA 14 Section 8.17 compliant with integral check and FM 1510 approval.
IBM Yorktown, Regeneron Tarrytown, Pfizer Pearl River, Bristol-Myers Squibb New Brunswick and Tesla Gigafactory Buffalo industrial fire protection and process safety. Industrial site with UVFDC-3W-2.5 3-way FDC for combined high-demand sprinkler/standpipe inlet, UVFDC-2W-FS freestanding FDC at fire lane where wall mount impossible, and UVFDC-TEST-4 test header on fire pump discharge for NFPA 25 annual pump flow testing. FM Global site compliance with FM Data Sheet 4-0 water supply guidance.
One World Trade, Empire State, Hudson Yards, Midtown Manhattan commercial towers, Long Island City and Downtown Brooklyn high-rise standpipe and sprinkler FDC. High-rise Class I/III standpipe with UVFDC-3W-2.5 3-way FDC on street frontage for increased inlet capacity per NFPA 14 Section 8.17, UVFDC-SIDE-2W flush sidewalk FDC for narrow frontage buildings, and UVFDC-ROOF-2W roof manifold FDC for auxiliary supply on buildings over 420 ft (per NFPA 14 for Class II multi-zone). Storz 5 inch UVFDC-STZ5-W at pump truck access zone for high-volume supply.
Columbia, NYU, Cornell Tech, Fordham, CCNY, Brooklyn Poly NYU, Stony Brook and Rutgers campus and Equinix NY1-NY11, Digital Realty 111 8th Avenue, 60 Hudson, 325 Hudson, 32 Avenue of the Americas and Telx/Digital Realty Weehawken data center. Campus and data center with UVFDC-2W-2.5 at each building ingress per NFPA 13 Section 8.17, UVFDC-TEST-4 fire pump test header at central fire pump house and UVFDC-STZ4-W Storz inlets at primary fire lane approach for FDNY apparatus. Integration with existing post indicator valves, fire pump and hydrant loop.
Fire pump room and test header. UVFDC-TEST-4 4-way 2.5 inch NH test header on fire pump discharge with individual pitot pressure gauge taps for NFPA 25 Chapter 8 annual fire pump flow test. Rated 300 psi working, mounted outside pump room on exterior wall for safe discharge to atmosphere. Satisfies NFPA 20 Chapter 4 pump test arrangement.
Related products for complete New York fire protection valve package
Fire pumps. UVFP-HSC, UVFP-ES and UVFP-VIL fire pumps feeding the FDC/sprinkler/standpipe per NFPA 20. See Fire Pumps New York.
Check valves. UVC-NR silent-closure and UVC-SW swing check valves for fire pump discharge and sprinkler supply between FDC and system per NFPA 13/14 Section 8.17. See Check Valves New York.
Hydrants. UVH-3DRY dry-barrel hydrants feeding the private fire main that supplies the FDC loop per NFPA 24 Chapter 7. See Hydrants New York.
Post indicator valves. UVPIV-BG post indicator valves as isolation on FDC supply branch per NFPA 24. See Post Indicator Valves New York.
Frequently asked questions (New York)
Is UNIVAL accepted by FDNY? Yes. UNIVAL UVFDC series is UL 405 Listed and FM 1510 Approved. FDNY accepts listed FDCs with factory submittal, NYC BC Chapter 9 compliance letter, NFPA 14 Section 8.17 documentation and hydrostatic test report. Sign identification per NFPA 14 Section 8.17.1 required on the installation.
2-way vs 3-way FDC for New York? 2-way (UVFDC-2W-2.5) satisfies minimum NFPA 14 requirement for Class I/III standpipes up to 500 gpm and NFPA 13 sprinkler systems. 3-way (UVFDC-3W-2.5) provides additional capacity for high-rise systems over 500 gpm or combined standpipe/sprinkler where engineer specifies extra inlet per NFPA 14 Section 8.17.2.
Storz vs threaded inlets? Threaded (UVFDC-2W, UVFDC-3W) uses 2.5 inch NH with FDNY-specific thread (NYC thread) for standard 2-way and 3-way inlets, compatible with existing FDNY threaded hose. Storz (UVFDC-STZ4-W, UVFDC-STZ5-W) uses 4 inch or 5 inch quick-connect with sexless coupling, allows rapid connection without threading but requires FDNY Storz spanner. Storz 4 inch (FDNY standard pumper inlet) and Storz 5 inch quick-connect inlets for FDNY apparatus.
Wall vs freestanding vs flush sidewalk? Wall-mount (UVFDC-2W, UVFDC-3W) is standard for buildings with exterior wall frontage. Freestanding (UVFDC-2W-FS) on pedestal post is required where wall mount is impossible (parking garages, set-back buildings, interior courtyards). Flush sidewalk (UVFDC-SIDE-2W) is required for narrow frontage where wall and pedestal are both impractical, with hinged cover plate to match sidewalk finish.
What is the pressure rating? Standard UVFDC is 300 psi working pressure with 600 psi hydrostatic test per UL 405. High-pressure option UVFDC-HP rated 400 psi working for industrial high-pressure loops. Internal clapper check rated same pressure class as body.
What is the delivery time to New York? Stock UVFDC-2W-2.5 with standard NH thread ships 2 to 3 weeks. Custom thread forms (Quebec, NYC, Boston, Storz) factory-built 3 to 5 weeks. Freestanding UVFDC-2W-FS with pedestal 4 to 6 weeks. Flush sidewalk UVFDC-SIDE-2W 4 to 6 weeks. Metro freight from Toronto HQ 3 to 5 business days.
How do I substitute Potter Roemer, Croker, Guardian, Elkhart and Zurn on a New York project? Submit substitution letter with UNIVAL UL 405/FM 1510 certificates, factory submittal drawing showing internal clapper check configuration, thread gauge verification and NFPA 14/13 Section 8.17 compliance. Engineer-of-record approval follows; FDNY accepts listed equivalent substitutions.
Contact ValveAtlas for New York FDC quotation
For FDC quotations, Potter Roemer Fig 5062, Croker 6700, Guardian GA4000, Elkhart S-300, Zurn Wilkins 375 and Dixon DIX substitution submittals for FDNY approval, or NFPA 14/13 Section 8.17 FDC packages with UL 405/FM 1510 listed integral check for JFK (JFK), LaGuardia (LGA), Newark Liberty (EWR) and Teterboro (TEB) airside, New York high-rise, industrial site, university campus, data center or fire pump test header projects, email the project architectural elevation, standpipe/sprinkler riser schedule and fire flow calculation to burakpadr@gmail.com or use the contact form. Same-day response on New York urgent orders.
Why Engineers Trust ValveAtlas for Fdc New York
ValveAtlas is the trusted fdc new york supplier for fire protection contractors, mechanical engineers, and industrial end users across Canada, the United States, and London, UK. Every fdc new york order ships with mill test certificates, UL/FM compliance letters, and dimensional drawings ready for engineer-of-record submittal. Reach the ValveAtlas team for fdc new york quotations, code authority liaison, and project staging support.
Related Locations
- Grooved Ball Valves Toronto | UL/FM Grooved-End Brass Ball Valves for Fire Protection | ValveAtlas
- Vannes Indicatrices Montreal: Vannes de Poste Indicateur UL 789/FM 1110/ULC pour Canalisations Principales Incendie Privees NFPA 24
- Fire Department Connections Boston | UL 405/FM 1510/NFPA 14 BFD | ValveAtlas
Codes & Industry Standards
Every fdc new york shipment from ValveAtlas is supported by the following code and listing references:
