Wet Alarm Valves New York

Wet Alarm Valves New York: UL and FM Listed Wet Alarm Valves with Retard Chamber and Trim for NYC Fire Protection Projects

ValveAtlas supplies UL Listed and FM Approved wet alarm valves to fire protection contractors, sprinkler subcontractors and EPC firms on New York City, Manhattan, Brooklyn, Queens, Bronx, Staten Island, Long Island and New Jersey metro projects. 2-day truck freight from Toronto HQ, FDNY-accepted UL/FM dual-listed valves, and full technical support for NYC DOB submittals.

This page is the technical reference for NYC specifying engineers selecting wet alarm valves, retard chambers, trim assemblies and pressure switches on wet pipe sprinkler systems governed by the NYC Building Code, FDNY Technical Memorandum, NFPA 13 and NFPA 72.

Wet alarm valve range for NYC projects

Type SKU End connection Pressure class Listings Sizes Typical NYC application
Wet alarm valve 300 psi UVW-1511-300 Grooved AWWA C606 300 psi CWP UL 193, FM Class 1041 2″ to 8″ Wet pipe sprinkler riser on Manhattan, Brooklyn, Queens high-rise
Wet alarm valve 500 psi UVW-1511-500 Grooved AWWA C606 500 psi CWP UL 193, FM 2″ to 8″ Supertall Zone 2/Zone 3 sprinkler systems
Retard chamber UVW-RC-30 1/2″ NPT 300 psi CWP UL/FM 30 sec retard Water hammer suppression on NYC systems
Pressure switch UVW-PS-DPDT 1/2″ NPT 300 psi CWP UL 753 DPDT 10A 125 VAC Waterflow alarm signal to NYC fire alarm panel
Complete trim kit UVW-TRIM Per valve size 300 psi CWP UL/FM 2″ to 8″ Drip cup, main drain, inspector test assembly

Why NYC contractors choose ValveAtlas

FDNY Technical Memorandum acceptance. Every UVW-series valve is UL/FM dual-listed, meeting FDNY acceptance criteria for fire protection installations in NYC. UL 193 certificate and FM Class 1041 certificate provided with every shipment for FDNY inspection and final sign-off.

High-rise Zone 2/Zone 3 500 psi option. UVW-1511-500 configuration is rated 500 psi CWP for supertall Zone 2 and Zone 3 sprinkler systems exceeding 300 psi working pressure. Same UL 193 and FM Class 1041 listing preserved for supertall-class buildings.

Complete trim package. Every UVW-1511-300 riser order ships with complete trim: ball drip, main drain, inspector test connection, 30-second retard chamber, dual pressure switches, and bronze check valve. Eliminates field-fabricated trim and contractor labor.

NYC DOB submittals. ValveAtlas provides complete NYC DOB submittal packages with UL/FM certificates, installation instructions, hydrostatic test records and engineer’s acceptance letters compatible with the NYC Building Code sprinkler provisions.

Code and listing acceptance for NYC

NYC Building Code. The NYC Building Code adopts NFPA 13 with NYC amendments and requires UL/FM listed wet alarm valves on all automatic wet pipe sprinkler installations in NYC. UVW-1511-300 meets UL 193 and FM Class 1041 listing requirements.

FDNY acceptance. FDNY Technical Memorandum requires manufacturer’s certification of UL/FM listing for every sprinkler riser component. ValveAtlas provides UL and FM certificates for every shipment.

High-rise Zone 2/Zone 3 standpipe and sprinkler. Manhattan high-rise Zone 2 and Zone 3 sprinkler systems require 500 psi CWP-rated wet alarm valves at the zone isolation. UVW-1511-500 is rated for these supertall sprinkler risers.

Public buildings and schools. NYC public building and school construction projects standardize on UL/FM listed wet alarm valves with complete trim assemblies.

Approved-equal submittals

Where a specification names a specific manufacturer, we prepare an approved-equal submittal package (listing certificates, dimensional drawings and material data) for review by the engineer of record and the authority having jurisdiction.

NYC-specific delivery logistics

Manhattan high-rise projects. Manhattan high-rise and supertall towers — bulk UVW-1511 orders palletized for elevator or crane hoist to upper floors. Coordination with building logistics for street-level unloading on narrow Manhattan streets.

Brooklyn and Queens. Long Island City, Downtown Brooklyn, Williamsburg, Greenpoint and Flushing projects — direct truck freight via Queens-Midtown Tunnel or Ed Koch Queensboro Bridge to job sites.

Bronx and upper Manhattan. Bronx, Washington Heights and Inwood commercial projects — 2-day freight via Cross Bronx Expressway to job sites.

Staten Island and New Jersey. Staten Island industrial, Jersey City, Hoboken and Newark metro projects — direct truck freight via Goethals Bridge or Holland/Lincoln Tunnels to job sites.

Long Island. Nassau County, Suffolk County, Long Island commercial and industrial — next-day delivery from NY metro hub warehousing.

Related products for complete NYC sprinkler riser package

Gate valves. UV0199 OS&Y flanged gate for NYC riser bases. See Gate Valves.

Butterfly valves. UVB-G310 grooved butterfly with integral tamper for NYC zone control. See Butterfly Valves New York.

Check valves. UL/FM swing check for FDC trim and fire pump discharge. See Check Valves.

Grooved couplings. UV11 rigid and UV14 flexible couplings for UVW-1511 connections. See Coupling Fittings New York.

Test and drain valves. Inspector test, main drain and test/drain manifolds for NYC riser base. See Test and Drain Valves.

Frequently asked questions (NYC)

Are these wet alarm valves accepted by FDNY? Yes. UVW-series wet alarm valves are UL/FM dual-listed, meeting FDNY acceptance criteria per FDNY Technical Memorandum. UL 193 and FM Class 1041 certificates provided for every shipment; FDNY inspectors accept at final inspection.

What documentation is required for NYC DOB submittal? UL certificate (UL 193), FM certificate (FM Class 1041), manufacturer’s installation instructions, hydrostatic test records, and engineer’s certification letter. ValveAtlas provides complete NYC DOB-ready submittal packages with each quote.

Do these valves meet high-rise Zone 2/Zone 3 pressure? Yes. UVW-1511-500 configuration is rated 500 psi CWP for supertall Zone 2/Zone 3 sprinkler systems exceeding 300 psi working pressure. Same UL 193 and FM Class 1041 listings preserved.

What is delivery time to NYC? Standard stock items ship from Toronto HQ within 2 business days to NYC metro. Same-day local NYC delivery available on emergency replacements via dedicated ground freight partners.

Contact ValveAtlas for NYC wet alarm valve quotation

For wet alarm valve quotations, approved-equal submittals for FDNY approval, or NYC DOB compliance packages on Manhattan, Brooklyn, Queens, Bronx, Staten Island, Long Island or NJ metro projects, email the project specification and drawings to info@valve-atlas.com or use the contact form. Standard turnaround is 48 hours.